|
|
Line 1: |
Line 1: |
| [[/20080701|20080701]] | | [[/20080701|20080701]] |
− | | + | [[/20081204|20081204]] |
− | # get xyz+ file
| |
− | # remove points preceding 2006
| |
− | # calculate time to next point
| |
− | # calculate distance to next point
| |
− | # pass through the list
| |
− | ## assign ID 1 to the first point
| |
− | ## continue through the points. If there is a time break more than ?? seconds, assign ID 2+
| |
− | ##:(Now we have a list of potential lines)
| |
− | # remove points with HDOP >= 8 and #SV < 4.
| |
− | # pass through the list again for each subset of points with the same ID
| |
− | ## assign ID.1 1 to the first point
| |
− | ## continue through the points. If there is a distance break more than ?? ft, assign ID.1 2+
| |
− | # Collect the point sets to create singlepart lines (for those points that have only 1 ID.1) and multipart lines (for those points that have multiple ID.1.
| |