Urbanaut Intermediate Size System
Approximate Cost Estimate per Mile (1.6 km) of Single Guideway at Surface - Type 3
Fixed Costs | ||
Type of Cost | % of total | Millions of dollars |
A. Excavation, drainage, sub-ballast, foundation slab, guide rail | 22 | $2.00 |
B. Passenger Loading/Unloading Facilities (2 Stations) | 4 | $0.40 |
C. Maintenance Yards & Operational Control Facility | 12 | $1.05 |
D. Electrical Power, Signals and Moving Block Control | 10 | $0.90 |
E. Rolling Stock (3 Single Vehicles or 3-Car Train) | 42 | $3.75 |
F. Fees & Contingencies of A-D | 10 | $0.90 |
Total cost of Intermediate Size per Mile (1.6 km) | 100 | $9.00 |
Note: For a list of variable costs not included above, go to this page
.