Picture #022 in A Day in the Life of a Tomography Mooring

022 The acoustic releases have been put over the stern and the mooring is presently held by another slip line at center. If the tension of the mooring is transferred too soon to the anchor, the mooring may deploy prematurely.... The location of a mooring needs to be fairly accurate - the actual and desired positions are typically within 100 m or so.