| Return to Home Page |
| Slide 2 |
| Travel Cost Method (Òrevealed preferencesÓ): |
| Damage Cost Avoided, Replacement Cost, and Substitute Cost Methods: |
| Contingent Valuation Method (CV or CVM) |
| Contingent Choice Method (CCM) |
| Benefit Transfer Method: |
| Market Price Method |
| Productivity Method |
| Hedonic Pricing Methods |
| Travel Cost Methods |
| Advantages of the Damage Cost Avoided, Replacement Cost, and Substitute Cost Methods |
| Advantages of the Contingent Valuation Method: |
| Issues and Limitations of the Contingent Valuation Method: |
| Issues and Limitations of the Contingent Valuation Method: |
| Advantages of the Contingent Choice Method |
| Issues and Limitations of the Contingent Choice Method |
| Advantages of the Damage Cost Avoided and Replacement Cost Methods |
| Strengths and Weaknesses Of Absolute (Dollar-Based) Ecosystem Valuation |
| Strengths and Weaknesses of Non-monetary Indices |