Questions relating to the performance of public undertakings
5) Is the scope of the undertaking adequate?  Are objectives and results commensurate with the need?  (Addressed by program analysis and program evaluation.)
1)Are the programÕs objectives appropriate? Are they desirable for a social welfare standpoint? (Addressed in policy analysis.)
2)Is the program economically efficient? Are the intended
     effects worth the costs?  (Addressed in cost-benefit analysis.)
3) Is the program effective?  Are the objectives being
    achieved? (Addressed in program evaluation.)
4) Is the operation technologically efficient?  Are
    resources being used to get the maximum result?
    (Addressed in cost-effectiveness analysis.)